This page provides you with some background information about the design of SPAR to help you understand some of the subtle features that can impact your seedling request. You'll learn about:

 

Common Error Messages

"Cannot find a valid sowing date" means there is no sowing date in the SPAR sowing date table for that combination of nursery, species, and stocktype. If you receive this message, first confirm you have selected the correct container type. If this is correct then email the nursery to ask them to add a sowing date to SPAR or contact SEEDHELP.

"Total selected is not within 15% of seedlings requested, override required" means there are not enough seedlings available to meet your requirements. If you get this message you should search for other Seedlots in the list with enough available seedlings. If you really want the original Seedlot then you could add two seedling requests, one with an amount that matches the seedlings available in that Seedlot, and a second to request the balance of your request from another Seedlot or you may enter an override reason.

"Passed the latest action date - override required" means there is not enough time between the date you are entering the seedling request and the sowing date to allow for the withdrawal and preparation of the Seedlots or Vegetative Lots. If this occurs save the seedling request as INC (Incomplete) and send an email to SEEDHELP providing the Request Key and Lot Number.

"Lot uses a species average germination - override required" means you have selected a lot before the germination tests on the lot have been completed. You may type an override comment on the Transfer Guide Exceptions screen.

 
  Top of Page

Seedling Request Statuses

The request status of the seedling request changes as the request moves through the business cycle as shown in the diagram below. Note that the request starts with a status of Pending. If all information is not available, you can use the Save Incomplete button to save the request with a status of Incomplete. Once you have selected a Seedlot or Vegetative Lot, the Save Request button can be used to move the status from Incomplete back to Pending.

The following table describes each status.

 

Status

Explanation

INC

Incomplete

Incomplete - in process but not finalized.  Use INC when not all of the information is available. When the status is INC, you can use DELETE mode.  Seedlot selection information will not be stored if the status is INC.

INC is set by the user.

PND

Pending

Pending - awaiting conclusion or confirmation.  Use PND for future planning or for requests awaiting approval.  When the status is PND, you can use DELETE mode.

PND is set by the user.

APP

Approved

Approved - given official sanction.  Use APP to approve seedling requests.  Requests can only be approved one year in advance.  If the status is APP, you cannot use DELETE mode.  Use CAN status to cancel.   If the status is APP, it cannot be returned to PND.

APP is set by the user. 

ACT

Active

Active - currently in effect or in use.  ACT indicates that an action has taken place on a Seedlot.  For example, the seed is in stratification.  You cannot use DELETE nor CAN mode once the status is ACT, unless you have the proper authority.

ACT is system set at the Tree Seed Centre.

CAN

Cancelled

Cancelled - to make no longer effective.  Use CAN to cancel an approved request.

CAN is set by the user.

COM

Complete

Complete - fulfillment of all processes.  COM indicates that a Seedlot has been shipped to the nursery.

COM is system set at the Tree Seed Centre.

Top of Page

When Can a Request No Longer Be Modified?

There is a point when a request can no longer be modified by a user.  This varies based on whether or not the request is ministry funded.

  • For non-ministry funded requests, a user can update a request while it is APP, but not once ACT. 
  • For ministry funded requests, a request can be modified while it is APP status, but once it has been assigned to a tender by BC Timber Sales Headquarters, it can not be modified by the user.  The tender information appears on the Request Status screen.